New fire protection system installed!

We recently completed a state-of-the-art fire water storage system, consisting of three 1,230 m³ FM certified tanks, at a major paper manufacturing facility.
The configuration ensures maximum safety and operational continuity: thanks to the triple redundancy of the water supply, the system guarantees availability even in case of emergencies or scheduled maintenance.
This achievement confirms how planning choices and high standards can make a real difference in complex industrial environments.
Being chosen for a project of this level is a source of pride and a further confirmation of the trust that our customers place in the quality signed by Rizzotto.

Condividi il post:

I nostri social

Ultimi articoli

Contattaci

Per dubbi o domande contattaci.

Ti potrebbe interessare anche: